Current delivery times from our manufacturers
For lead time or stock information of specific parts, please use the seach to find the part in our webshop or contact us. The current general overview can be found in the following table.
Trasna
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Trasna cellular modules
u-blox Cellular Products are now handled by Trasna
Allocation: no
|
u-blox Cellular Products are now handled by Trasna | 12-14 weeks | no |
u-blox
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
u-blox GNSS Standard Modules
MAX, NEO, ZED, SAM, CAM, DAN
Allocation: no
|
MAX, NEO, ZED, SAM, CAM, DAN | 12 weeks | no |
|
u-blox GNSS SiP Modules
MIA, ZOE, EVA
Allocation: no
|
MIA, ZOE, EVA | 12-16 weeks | no |
|
u-blox GNSS Evalkits + Antennas
EVK-M8/M9, EVK-F9/F10, EVK-X20/F20, ANN-
Allocation: no
|
EVK-M8/M9, EVK-F9/F10, EVK-X20/F20, ANN- | 16 weeks | no |
|
u-blox Short Range Modules
SIP module lead-time is 16 weeks (ANNA-B), NORA-B1 Standard Lead Time is 8 weeks
Allocation: no
|
SIP module lead-time is 16 weeks (ANNA-B), NORA-B1 Standard Lead Time is 8 weeks | 12 weeks | no |
|
u-blox Short Range Eval Kits
all Short Range Kits
Allocation: no
|
all Short Range Kits | 12 weeks | no |
|
Trasna cellular modules
u-blox Cellular Products are now handled by Trasna
Allocation: no
|
u-blox Cellular Products are now handled by Trasna | 12-14 weeks | no |