Current delivery times from our manufacturers
For lead time or stock information of specific parts, please use the seach to find the part in our webshop or contact us. The current general overview can be found in the following table.
Amphenol
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 12-16 Weeks | no |
Antenova
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Antennas (SMD, Embedded, External, Active GNSS) Allocation: no | 9 - 10 weeks | no |
Capxon
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Electrolyte wired Allocation: no | 20 - 28 weeks | no |
Cavli Wireless
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Cellular Modules Allocation: no | 8-10 weeks | no |
CML
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| SOP und TSSOP ICs Allocation: no | 10 - 12 weeks | no | |
| CMX869B Allocation: | 20 or more weeks | ||
| CMX7031 / CMX7032 / CD636 Allocation: | 20 or more weeks | ||
| SCT3258 / 3268 Allocation: | 24 weeks | ||
| QFN ICs Allocation: no | 14 - 16 weeks | no | |
| CMX86x modem family Allocation: no | 20 or more weeks | no | |
| CMX994E / CMX994G / RP571 / SCT3811 Allocation: | 33 weeks | ||
| CMX148 / CD686 / CMX885 Allocation: | 20 weeks | ||
| CMX901QT8 Allocation: no | 20 or more weeks | no | |
| CMX7041/2 AIS device family Allocation: no | 20 or more weeks | no |
CONEC
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8-10 weeks | no |
Congatec
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
COM's
back to normal LT
Allocation: no
|
back to normal LT | 16-22 weeks | no |
|
Cooling
HSP and CSAP
Allocation: no
|
HSP and CSAP | 10-12 weeks | no |
|
COM's
back to normal LT
Allocation: no
|
back to normal LT | 16-22 weeks | no |
| Baseboard Allocation: no | 16-22 weeks | no |
DARFON
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| MLCC und MLCI Allocation: no | 14 - 16 weeks | no |
DEGSON
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8-10 weeks | no |
Digi International
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Digi XBEE Modules
pls check actual lead times with sales
Allocation: no
|
pls check actual lead times with sales | up to 25 weeks | no |
|
Digi ConnectCore i.MX9
CC91, CC93
Allocation: no
|
CC91, CC93 | 12-16 weeks | no |
|
Digi ConnectCore STM32MP1/MP2
STM32MP1, STM32MP2
Allocation: no
|
STM32MP1, STM32MP2 | 12-16 weeks | no |
| Digi ConnectCore i.mx6/8 Allocation: no | 30-50 weeks | no |
ept
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8-10 weeks | no |
finder
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: partly | 4-6 weeks | partly |
Harting
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8-10 weeks | no |
Honeywell
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Core Parts available in 4-8 weeks
Allocation: no
|
Core Parts available in 4-8 weeks | 4-25 weeks | no |
Hosonic
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| MHz oscillators Allocation: no | 6-8 weeks | no | |
|
Quartz resonators
leadtime and availability depends on package size
Allocation: no
|
leadtime and availability depends on package size | 6 - 10 weeks | no |
Innodisk
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Flash CF Card Allocation: no | 2 - 6 weeks | no | |
| Flash SLC Allocation: no | 2 - 6 weeks | no | |
| Flash MLC Allocation: yes | 2 - 6 weeks | yes | |
| DRAM Allocation: no | 2 - 4 weeks | no | |
|
DRAM DDR3 und DDR4
supply is unstable and price are changing constantly.
Allocation: yes
|
supply is unstable and price are changing constantly. | 8 - 14 weeks | yes |
| Flash TLC Allocation: no | 2-6 weeks | no |
JYA NAY
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Ceramics Allocation: no | 16 - 20 weeks | no |
KDS
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Quartz resonators
some goods available from stock
Allocation: no
|
some goods available from stock | 10 - 14 weeks | no |
| Oscillators and TCXOs Allocation: no | on request | no |
KEMET
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Tantal MnO2
leadtime and availability heavily depends on package size
Allocation: no
|
leadtime and availability heavily depends on package size | 10 - 50 weeks | no |
| Supercaps Allocation: no | 22 - 30 weeks | no | |
| Tantal Polymer Allocation: no | 20 - 50 weeks | no | |
| Electrolyte Allocation: no | 24 - 38 weeks | no | |
| Filter Allocation: no | 40 - 50 weeks | no | |
| Film Allocation: no | 28 - 36 weeks | no | |
| Sensors Allocation: no | 22 - 40 weeks | no | |
| Inductors Allocation: no | 30 - 40 weeks | no | |
| Magnetics Allocation: no | 28 - 36 weeks | no | |
|
MLCC / Ceramics
leadtime and availability depends on series/size of product
Allocation: no
|
leadtime and availability depends on series/size of product | 10 - 50 weeks | no |
| Flex Suppressor (EMI Sheet) Allocation: no | 10 - 12 weeks | no |
KJ
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Electrolyte SMD Allocation: no | 26-42 weeks | no |
MicroCrystal
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
RTC modules
some goods available from stock
Allocation: no
|
some goods available from stock | 8 - 10 weeks | no |
| kHz quartz resonators Allocation: no | 7-10 weeks | no |
ORTUSTECH
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| TFT Displays Allocation: no | 24-28 weeks | no |
Provertha
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8-10 weeks | no |
Schaffner
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| 3 Phase filter Allocation: no | 22-24 weeks | no | |
| 1 Phase filter Allocation: no | 22-24 weeks | no | |
| Chokes Allocation: no | 22-24 weeks | no | |
| Sinusoidal filters and mains chokes Allocation: no | 24-26 weeks | no | |
| Special types (FS & RU) Allocation: no | 28-30 weeks | no |
Schaltbau
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Allocation: no | 8 weeks | no |
SiTime
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
New orders (depending on series)
Replenishment Lead time for Standard Series, SiT1602, SiT8008, SiT8009,SiT9120, SiT9121, SiT9122
Allocation: no
|
Replenishment Lead time for Standard Series, SiT1602, SiT8008, SiT8009,SiT9120, SiT9121, SiT9122 | 14 - 20 weeks | no |
|
Programmed by SE
Standard Types: SiT8008/9, SiT9121/2, SiT8918/9, SiT1602, SiT9120
Allocation: no
|
Standard Types: SiT8008/9, SiT9121/2, SiT8918/9, SiT1602, SiT9120 | 8-12 weeks | no |
Taoglas
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Antennas Allocation: no | 12-14 weeks | no |
THINGWELL
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Displays (Grafik, Character, ePaper) Allocation: no | 12 - 28 weeks | no |
Trasna
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Trasna cellular modules
u-blox Cellular Products are now handled by Trasna
Allocation: no
|
u-blox Cellular Products are now handled by Trasna | 12-14 weeks | no |
u-blox
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
u-blox GNSS Standard Modules
MAX, NEO, ZED, SAM, CAM, DAN
Allocation: no
|
MAX, NEO, ZED, SAM, CAM, DAN | 12 weeks | no |
|
u-blox GNSS SiP Modules
MIA, ZOE, EVA
Allocation: no
|
MIA, ZOE, EVA | 12-16 weeks | no |
|
u-blox GNSS Evalkits + Antennas
EVK-M8/M9, EVK-F9/F10, EVK-X20/F20, ANN-
Allocation: no
|
EVK-M8/M9, EVK-F9/F10, EVK-X20/F20, ANN- | 16 weeks | no |
|
u-blox Short Range Modules
SIP module lead-time is 16 weeks (ANNA-B), NORA-B1 Standard Lead Time is 8 weeks
Allocation: no
|
SIP module lead-time is 16 weeks (ANNA-B), NORA-B1 Standard Lead Time is 8 weeks | 12 weeks | no |
|
u-blox Short Range Eval Kits
all Short Range Kits
Allocation: no
|
all Short Range Kits | 12 weeks | no |
|
Trasna cellular modules
u-blox Cellular Products are now handled by Trasna
Allocation: no
|
u-blox Cellular Products are now handled by Trasna | 12-14 weeks | no |
Wima
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Foil Allocation: no | 14-18 weeks | no |
Winstar
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
| Displays (TFT and Smart) Allocation: no | 18 - 24 weeks | no | |
| Displays (Grafik and Character) Allocation: no | 14-18 weeks | no | |
| OLED modules Allocation: no | 14-18 weeks | no | |
| Winstar - smart displays Allocation: no | 12 - 24 weeks | no |
Xsens
| Area | Standard Lead Time | Allocation | |
|---|---|---|---|
|
Rugged devices
Small Qty available in approx 2-3 weeks
Allocation: no
|
Small Qty available in approx 2-3 weeks | 9-10 weeks | no |
|
Xsens rugged modules
Small Qty available in approx 2-3 weeks
Allocation: no
|
Small Qty available in approx 2-3 weeks | 6 - 8 weeks | no |
| SMD modules Allocation: no | 5 - 7 weeks | no |